For builders and designers

The pre-wire checklist, from framing to paint

One page per house. Hand it to your electrician, tick it off at each inspection and keep it in the job binder. Check it against your plans and your local inspector.

  1. Step 1: Before framing

    • Send us the plan set, the lighting layout and the window schedule

    • Name each room and say who uses it and when

    • Agree who marks the walls: our installer or your electrician

  2. Step 2: At framing

    • Keypad and dimmer boxes marked on the studs at the height the owner chose

    • Deep boxes where several dimmers share one wall

    • A neutral wire at every switch box

    • Shade pockets and header depths checked against the motor

    • Low-voltage runs kept apart from line voltage

  3. Step 3: Rough-in

    • Home-run cable to one closet, with the network and control panel spaced for growth

    • Conduit stubs and cable paths for outdoor lights and the transformer

    • Cables labeled at both ends, with the labels on the plan

  4. Step 4: Before drywall

    • Photos of every wall, taken square on and filed with the plan

    • A walk with your electrician before inspection

    • Access points marked, so a later change does not mean a new hole

  5. Step 5: After paint

    • Devices set and engraved keypads fitted

    • Scenes and schedules programd in each finished room

    • A walk-through with the owner and a one-page guide for the house

Why framing

The cheapest hour to place a keypad is before the drywall

At framing a box moves with a drill and a minute. After drywall it moves with a saw, a patch and a painter.

  • One set of marks

    Your electrician wires the line voltage and we run the control cable, from the same marked-up sheet.

  • Your schedule first

    We book the rough-in and the walk around your inspection dates, not the other way around.

Metal stud framing with armored cable bundles dropping to a junction box

Builder questions

What builders ask first

When should a builder call you?

When the framing goes up, and no later than before the electrician's rough-in is inspected. That is when keypad boxes, shade pockets and low-voltage runs can still be placed without opening a finished wall.

Do you work with my builder, electrician or designer?

Yes. On most custom homes we are one of several trades. We take the plan set and the schedule from your builder, and we work from the same marked-up sheet as the electrician who wires the line-voltage side.

What do you need from me to quote a pre-wire?

The plan set, the lighting layout if there is one, and the window schedule. If a drawing is missing, we can mark up the floor plan on the first walk.

Send the plans

Ask for a pre-wire scope

Tell us the address, the framing date and who your electrician is. We reply in office hours.